All components of the project are being assembled and checked both before and after the painting process. During the second and final assembly, all the components with final finishes, locks and the lightings are being completed and tested as a rehearsal of the real installation at site.

According to our quality assessment certified by ISO 9001, the project leader, general supervisor and production manager are checking the compliance with approved criteria of design, operational requirements, and the production quality and continue with following up the touch up process if necessary.

After the touch ups, a report of approval is being completed with final pictures and shared also with the client by the project leader.

Upon getting the approval of packing, the entire packaging process is being managed elaborately as per the stability and sustainability standards of our packaging procedure.